Key Control Points for High-Pressure Blower Installation

1) Establishing the Installation Foundation
High-pressure blowers can be installed at any angle, therefore the foundation has very high requirements. Its dimensions and load-bearing capacity must meet the specified requirements. Generally, the load-bearing capacity of the installation foundation must be 3 to 5 times the weight of the high-pressure blower. Ensure the flatness of the foundation base and that all oil, debris, and dirt are cleaned from the foundation surface and the pre-drilled holes for the anchor bolts. Also, smooth the foundation surface where the shims will be placed.

 

2) Setting the Baseline
Once the high-pressure blower is in place, lay out the foundation according to the installation drawings, foundation axis, and elevation lines. Locate the equipment's foundation centerline and corresponding installation standards. If there are interconnected or arranged pieces of equipment, they should be aligned on the same installation baseline to ensure installation stability and prevent displacement due to vibration during later use.

 

3) Unloading and Positioning
To facilitate the transportation and installation of the high-pressure blower, the blower main unit and generator are temporarily fixed on the same base. Use a crane of approximately 20 tons to unload the high-pressure blower and other equipment from the transport vehicle. Then, place them on two parallel guide rails, and support the underside of the guide rails to prevent uneven force distribution from deforming the blower base, which would affect the blower installation and operation. Set a fixed unloading position for the blower in the blower room, and then use a 10-ton hoist to pull the blower from the guide rails into the blower room.

 

4) High-Pressure Blower Assembly
Install a 10-15 ton overhead crane in the blower room to facilitate the installation, commissioning, and subsequent maintenance of the high-pressure blower. However, the overall weight of the high-pressure blower is often greater than the lifting capacity of the overhead crane, so it must be lifted in separate parts. The blower base is provided by the manufacturer. During the blower installation, leveling the base will effectively ensure that the motor shaft and the equipment shaft are on the same horizontal line. The blower foundation must undergo system testing to ensure that all indicators meet the high-pressure blower installation requirements before installation can proceed.

 

5) Blower Assembly
The high-pressure blower assembly must be completed under the guidance of the manufacturer's technical personnel. The connection points between the main unit and the base, and between the motor and the blower base, must be inspected using a 0.04mm feeler gauge to ensure there are no gaps. The outer diameter of the coupling should be controlled at 300mm (±1mm), the end face clearance should be controlled at 3~5mm, and the inclination of the coupling axis should be less than 0.2/1000. To ensure the quality of the high-pressure blower assembly, the connecting bolts should be provided by the manufacturer, and blowers of the same model should be equipped with bolts of the same specifications.